The Transport of London was entitled to determine that a company was not eligible to participate in its congestion charge fleet notification scheme as its vehicles were not "controlled and managed" in practice to a significant extent in accordance with the terms and conditions of the scheme.
[2005] EWHC 3002 (Admin)